Mission Everest Continues!

Yesterday the weather was good up here , we took some rest in Camp 2. Today we departed Camp 2, our Advanced Base Camp, at 7 AM to climb up the Lhotse Face to Camp 3 at nearly 23,500 ft. (7120m) We donned our Down Suits to stay warm in the early morning before the sun arrived on the Lhotse Face at around 9 AM. Climbing up the steep ice was challenging, but our steel crampons held firm as we made our way up the face to Camp 3.

Upon reaching Camp 3 we took a long break and had a snack before making our way down the Lhotse Face, rappelling the steeper line over the blue ice to the base of the Lhotse Face near the Bergschrund. We then made our way back to Camp 2 for dinner and a restful sleep. Our plan is to either descend tomorrow or take a rest day and descend the following day down to Everest base camp, and then take a long rest before embarking on our summit rotation!

Today our climbing sherpas carried loads to the South Col high camp (Camp 4) in preparation for the final rope fixing to the summit of Mount Everest – Our Rope fixing team fixed the rope upto South Col! . Now that all of the essential equipment is in place for the rope fixing (ropes, ice screws, carabiners, oxygen, etc) we are keeping an eye on the weather for an opportunity to fix the final portion of the route up the Triangular Face to the Balcony (27,500 ft / 8335m), then up the south east ridge and over the rock bands to the south summit, along the summit ridge to the top of the world! Stay tuned for updates from our rope fixing team!

Today we departed Mount Everest base camp at 4 AM and climbed up through the Khumbu Icefall in the pre dawn hours when the ice is solid. Then we had the pleasure of a beautiful sunrise as we ascended up through the Icefall to Camp 1. After reaching Camp 1 we continued up through the Western CWM (valley) to Camp 2, our Advanced Base Camp. It was a long day of climbing, but we are happy to finally have arrived in our Advanced Base Camp on Mount Everest and now looking forward to a rest day tomorrow! Everyone is doing well here on Mount Everest!

Today our Sherpas carried 10 loads of ropes and hardware from Camp 2, our Advanced Base Camp, to the South Col high camp (Camp 4) on Mount Everest.  This load carry is approximately 4,500 ft. (1380m) from Camp 2 to Camp 4, and very strenuous day, which involves climbing the steep ice of the Lhotse Face, crossing the rock formation known as the Yellow Band, and then up and over the secondary rock formation known as the Geneva Spur, a ridge line which separates the upper Lhotse Face.  Our Sherpas are planning to carry another 10 loads of essential equipment tomorrow, to complete the positioning of gear necessary for the rope fixing project to reach the summit of Mount Everest.


Today all of our climbers and guides in our main team descended from Camp 2 down to Everest base camp after a great first rotation! We ended up staying an extra night at Camp 2 for acclimatization because everything was going so well for us up at our “Advanced Base Camp”. This will assist us in our acclimatization process as we prepare for our ‘summit rotation’. We spent two nights at Camp 1 and three nights at Camp 2 while we were up on our ‘first rotation.

Today, while we were preparing to descend to base camp at 6 AM from Camp 2, we received information that the icefall route had changed . Our team at basecamp were saying that it was in the process of being repaired. So, we delayed our descent to around 10 AM when we had confirmation that the new variation in the Khumbu Icefall route was complete, arriving base camp this afternoon. Our team is excited to be back in Everest base camp where the air is thick, the food amazing, and the accommodations seeming very plush after nearly a week up high on the mountain.

 

Rope Fixing Update:

Over the last few days our expert team of Nepal Climbing Sherpas were able to fix ropes to the Geneva Spur, just short of the South Col (Camp 4) high camp on Mount Everest, despite the windy conditions and the icier than normal slope on the Lhotse Face. Now, with an up line and a down line in place from the base of the Lhotse Face to Camp 3, and then a single line going above that to the Geneva Spur, teams will be able to acclimatize and position loads up higher on the mountain.

Our rope fixing team is preparing to head back up and fix ropes all the way to the South Col in the coming days and then position oxygen and equipment for the ‘summit fixing’ project at the South Col so that when the weather conditions permit they can begin fixing ropes from the South Col up towards the Balcony, the South Summit, and onward to the summit of Mount Everest. They will also install a second ‘down line’ in places to ease congestion on the route such as on the Yellow Band, the Geneva Spur, and at other bottlenecks along the route. All is well here on Mount Everest and we hope for good weather and route conditions to continue!

Arrived At Camp 2

First Rotation : Arrived At Camp 2

Our team has arrived at Camp 2 on Mount Everest! Today we climbed from our Camp 1 up through the Western CWM and arrived at Camp 2 in the early afternoon. We are settling in now and excited to be in our “ABC” or Advanced Base Camp! Everyone is doing well!