Day 23 & 24 : First Rotation complete, Rope Fixing Update!


Today all of our climbers and guides in our main team descended from Camp 2 down to Everest base camp after a great first rotation! We ended up staying an extra night at Camp 2 for acclimatization because everything was going so well for us up at our “Advanced Base Camp”. This will assist us in our acclimatization process as we prepare for our ‘summit rotation’. We spent two nights at Camp 1 and three nights at Camp 2 while we were up on our ‘first rotation.

Today, while we were preparing to descend to base camp at 6 AM from Camp 2, we received information that the icefall route had changed . Our team at basecamp were saying that it was in the process of being repaired. So, we delayed our descent to around 10 AM when we had confirmation that the new variation in the Khumbu Icefall route was complete, arriving base camp this afternoon. Our team is excited to be back in Everest base camp where the air is thick, the food amazing, and the accommodations seeming very plush after nearly a week up high on the mountain.

 

Rope Fixing Update:

Over the last few days our expert team of Nepal Climbing Sherpas were able to fix ropes to the Geneva Spur, just short of the South Col (Camp 4) high camp on Mount Everest, despite the windy conditions and the icier than normal slope on the Lhotse Face. Now, with an up line and a down line in place from the base of the Lhotse Face to Camp 3, and then a single line going above that to the Geneva Spur, teams will be able to acclimatize and position loads up higher on the mountain.

Our rope fixing team is preparing to head back up and fix ropes all the way to the South Col in the coming days and then position oxygen and equipment for the ‘summit fixing’ project at the South Col so that when the weather conditions permit they can begin fixing ropes from the South Col up towards the Balcony, the South Summit, and onward to the summit of Mount Everest. They will also install a second ‘down line’ in places to ease congestion on the route such as on the Yellow Band, the Geneva Spur, and at other bottlenecks along the route. All is well here on Mount Everest and we hope for good weather and route conditions to continue!

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.