Tag Archive for: 2018

The main Everest team is at camp 3, with guides Garrett, Conan, Sid with climbers Josh, Matt, Randy, Tym and David. Everyone is doing well. We had a great day with nice weather climbing from our Camp 2 to Camp 3 on the Lhotse Face. The total climb took us about 5 hours. Additionally, After moving into camp 3 we had some soup and have been rehydrating, and enjoying the views from this spectacular location.

Also, we had the pleasure of seeing our advance team of Everest climbers Ed & Ant as they descended the Lhotse face after their successful summit of Mount Everest yesterday with 4 of our amazing climbing Sherpas. They were a little tired which is to be expected. But, they were in good spirits as they made their way down the Lhotse face to our camp 2 where they will spend the night. Tomorrow, they will descend to our Everest base camp.

Furthermore, our second team of Kenton, Ben, and Mark decided to rest today at the South Col high camp (Camp 4) with their Sherpas. They are planning to start their climb tonight!  Fingers crossed for good weather!

everest route Madison Sherpas open Everest Route!

Our Sherpas worked very hard today to break trail through waist deep snow and some strong winds. They have now established the climbing route to the summit of Mount Everest! They are now back at the south col high camp (camp 4).

The Rope Fixing Team Members are: Pasang Tenzing, Lakpa Dendi Sherpa, Pas Dawa Sherpa, Tenzing Gyalzen, Datuk Bhote, Pemba Sherpa, Jenjen Bhote, Siddhi Bahadur Tamang.

We are happy that our team made the first summit of Mount Everest in 2018. Now, hopefully many other climbers will be able to follow the route safely to the summit over the next week if we have good weather.

Mission Everest Continues!

Yesterday the weather was good up here , we took some rest in Camp 2. Today we departed Camp 2, our Advanced Base Camp, at 7 AM to climb up the Lhotse Face to Camp 3 at nearly 23,500 ft. (7120m) We donned our Down Suits to stay warm in the early morning before the sun arrived on the Lhotse Face at around 9 AM. Climbing up the steep ice was challenging, but our steel crampons held firm as we made our way up the face to Camp 3.

Upon reaching Camp 3 we took a long break and had a snack before making our way down the Lhotse Face, rappelling the steeper line over the blue ice to the base of the Lhotse Face near the Bergschrund. We then made our way back to Camp 2 for dinner and a restful sleep. Our plan is to either descend tomorrow or take a rest day and descend the following day down to Everest base camp, and then take a long rest before embarking on our summit rotation!

Today our climbing sherpas carried loads to the South Col high camp (Camp 4) in preparation for the final rope fixing to the summit of Mount Everest – Our Rope fixing team fixed the rope upto South Col! . Now that all of the essential equipment is in place for the rope fixing (ropes, ice screws, carabiners, oxygen, etc) we are keeping an eye on the weather for an opportunity to fix the final portion of the route up the Triangular Face to the Balcony (27,500 ft / 8335m), then up the south east ridge and over the rock bands to the south summit, along the summit ridge to the top of the world! Stay tuned for updates from our rope fixing team!

Puja Day:

 Yesterday was our Puja ceremony in base camp. Our whole team of climbers and Sherpas took part with a Buddhist lama. They ask  permission for the mountain to grant us safe passage. After the blessing was complete and our Puja ceremony finished, we commenced with some dancing and traditional Sherpa / Nepali music. Then, our whole team walked down to the helicopter pad in base camp to reconstruct the helipad. Our team of climbers & Sherpas, 40 men in total, worked for 2 hours to carry rocks and gravel to the helipad .They level the surface in preparation for the helicopter flights to transport the loads of equipment for the rope fixing project . i.e (ropes, carabiners, ice screws, etc.) from base camp to Camp 2 on Mount Everest.

Today at 6 AM we awoke to a cloudy sky in base camp. But, soon after the clouds burned off and the weather was suitable for flying. We transported all of the equipment for the rope fixing project (750 kg) from our base camp to the helipad . Until then waited for the AS 350 B3E helicopter to arrive. By 8:30 AM the helicopter arrived and the first load went up to Camp 2 where our climbing Sherpas had been waiting anxiously for the helicopter to land. And, unload the equipment.

They had arrived earlier in the day and already scouted a suitable landing zone for the helicopter . They were communicating with us in base camp by VHF radio regarding the weather conditions at Camp 2 . Additionally, the expected arrival time of the first helicopter load. In total 7 flights were made from the base camp helipad with equipment for the rope fixing project. This will be deposited in our Camp 2 where our Sherpas will collect the equipment. Afterwards, they will begin rope fixing up the Lhotse face towards Camp 3 on April 19th. As, Tomorrow April 18th is a ‘black day’ in memory of the 2014 Khumbu Icefall tragedy that took the lives of 16 Sherpas.

Icefall Training, and Rope Fixing Update

Our team of climbers is currently training in the lower Khumbu Icefall today practicing ascending vertical fixed ropes, rappelling, and crossing ladders. They are training for the preparation for our climb to Camp 1. The weather is nice and we are excited that everything is on track so far for Everest 2018!