Day 29 : Second Rotation Started !
Today we departed Mount Everest base camp at 4 AM and climbed up through the Khumbu Icefall in the pre dawn hours when the ice is solid. Then we had the pleasure of a beautiful sunrise as we ascended up through the Icefall to Camp 1. After reaching Camp 1 we continued up through the Western CWM (valley) to Camp 2, our Advanced Base Camp. It was a long day of climbing, but we are happy to finally have arrived in our Advanced Base Camp on Mount Everest and now looking forward to a rest day tomorrow! Everyone is doing well here on Mount Everest!
Today our Sherpas carried 10 loads of ropes and hardware from Camp 2, our Advanced Base Camp, to the South Col high camp (Camp 4) on Mount Everest. This load carry is approximately 4,500 ft. (1380m) from Camp 2 to Camp 4, and very strenuous day, which involves climbing the steep ice of the Lhotse Face, crossing the rock formation known as the Yellow Band, and then up and over the secondary rock formation known as the Geneva Spur, a ridge line which separates the upper Lhotse Face. Our Sherpas are planning to carry another 10 loads of essential equipment tomorrow, to complete the positioning of gear necessary for the rope fixing project to reach the summit of Mount Everest.
Leave a Reply
Want to join the discussion?Feel free to contribute!