Second rotation concluded, Rope fixing team poised for Summit fixing!
Second Rotation Succeed!
We concluded a great second rotation today by descending from our Camp 2, known as our Advanced Base Camp, all the way down to our Everest base camp. While on our rotation we spent three nights at our Camp 2, and were very lucky to have great weather. To begin our rotation, we departed our base camp at 4 AM and climbed all the way to Camp 2.
Then, we took a rest day to recuperate and recover from the big climb, nearly 4,000 ft (1,212m) of vertical gain. After our rest day we planned to climb to our Camp 3 on the Lhotse Face, so we departed our Camp 2 (Advanced Base Camp) at 8 AM .We climbed with our down suits to the base of the Lhotse Face, then began our ascent up the steep ice wall on the fixed ropes towards Camp 3. It is situated about halfway up the Lhotse Face at approximately 23,500 ft. (7,121m).
The Lhotse Face is notably icier this year and requires good crampon technique! After 5 hours of climbing we reached our Camp 3 and took a long break to rest, hydrate, and eat a few snacks. We also had the privilege of enjoying an amazing view from Camp 3, looking down over Camp 2, the Western CWM, and Camp 1. We then descended the fixed rope designated for rappelling and made good time in our descent, reaching our Camp 2 just an hour later for a late afternoon lunch. It was a very productive rotation in that we accomplished our goal of climbing to Camp 3 to acclimatize . Additionally, we also familiarize ourselves with the steep and technical terrain of the Lhotse Face.
Rope Fixing Update!
Our Sherpas have been busy carrying loads of equipment to the South Col high camp (Camp 4) for the final stage of the rope fixing project . This involves setting the ropes from the South Col to the Summit of Mount Everest. They have done an exemplary job so far by setting two lines up to Camp 3. One for ascending and one for descending, as well as an additional line above Camp 3 to ease congestion on the route. We have received many compliments regarding how the lines are set in a safe and desirable fashion on the Lhotse Face which makes for efficient climbing.
Lines have also been set on the Geneva Spur, the final rock ridge before the South Col, so that climbers can go up and down on separate lines for safety and efficiency. At this time Sherpas have been utilizing these ropes to carry loads of oxygen cylinders, tents, food, and fuel to position at the South Col for the eventual summit attempt on Mount Everest!
Weather Forecast!
According to our weather forecasts, it appears that a major wind event is approaching Mount Everest, probably in the next day or two. Our Sherpas will make good use of tomorrows marginal weather forecast to position additional loads at the South Col high camp, and then see if the following day is appropriate for climbing above 8000 meters. The jet stream will likely cover the Mount Everest region for up to a week and no climbing will take place above 8000 meters during this time, so we are preparing to hold tight and wait for the opportunity when the Jet Stream passes and the winds are calm enough for a summit attempt! Until then we plan to rest and enjoy the amenities of our Everest base camp!